9

May 2, 1926. Building the Poughkeepsie Highway Bridge. On the extreme right the incline timbers are for the cableway leading into the cable anchorages 100 feet deep. At the foot of the railway track is a pile of “I” bars and at the extreme left a pile of finished steel pins for fastening the “I” bar chain together the hole to be buried in concrete in the anchorage holes for cable anchorages.